Project in Lokeren Imprimer Envoyer

The 4 turbines of  Lokeren in construction on the North side of the motorway – February 2017

Wind Farm Lokeren : 4 wind turbines along the E17

4 turbines Enercon E82 of 2,3 MW power

Total height 150 m – diameter 82 m

Construction started in spring 2016

Operations started in April 2017

Green energy for 5.500 households

The project has been developed and is operated by Storm Lokeren BVBA

 